01 — Quick Reference
Menu map
| Group | Models |
|---|---|
| Restrictions & Defects | InfraRestriction · InfraDefect · InfraAssessment · InfraRemedialWork · InfraVerification |
| Assets & Inspection | InfraAsset · InfraInspectionPlan · InfraInspection |
| Network Links | InfraDependency · InfraObligationTask · InfraSafetyHold · InfraCaseLink |
| Terminal Structure | InfraArea · InfraTerminal · InfraPort |
Every model (15) — one line each
| Model | It records | Key foreign keys |
|---|---|---|
| InfraPort | The port | — |
| InfraTerminal | A terminal in the port (network entity infrastructure.terminal) |
InfraPort |
| InfraArea | An area of a terminal: berth area, wharf, yard, stockpile, conveyor corridor, road (network entity) | InfraTerminal |
| InfraAsset | A fixed asset (berth, wharf structure, fender, conveyor support, pavement ...) with condition grade; may have a parent asset (network entity) | InfraArea, InfraAsset (parent) |
| InfraInspectionPlan | How and how often an asset is inspected, and when the next inspection is due | InfraAsset |
| InfraInspection | One inspection with its condition grade and findings; draft, accepted or rejected | InfraInspectionPlan |
| InfraDefect | A defect found on an asset, with severity | InfraAsset, InfraInspection |
| InfraAssessment | The engineering assessment of a defect and its recommendation; needs an approver | InfraDefect |
| InfraRestriction | An engineering restriction on an asset (load, draft, speed, access limit, closure); versioned; network entity infrastructure.restriction |
InfraAsset, InfraDefect, InfraAssessment |
| InfraRemedialWork | The work that repairs a defect (the work itself is done elsewhere, external_work_ref) |
InfraDefect |
| InfraVerification | An independent verification, by someone other than the performer, that allows a restriction to be released | InfraRestriction, InfraRemedialWork |
| InfraDependency | Another application's record that depends on an asset (equipment installed, handling route, berth structure, evidence) | InfraAsset |
| InfraObligationTask | Overlay. A local task for an obligation assigned by assurance (assurance.obligation_assigned) |
— (obligation and case by cid) |
| InfraCaseLink | Overlay. The link to an assurance case and its closure (assurance.case_closed) |
— (case by cid) |
| InfraSafetyHold | Overlay. A scoped safety hold received from safety (safety.restriction_changed) |
InfraAsset |
Vocabularies
- InfraRestriction.status: draft · active · released · cancelled
- InfraRestriction.restriction_type: load_limit · draft_limit · speed_limit · access_limit · closure · other
- InfraDefect.status: open · assessed · in_remediation · closed
- InfraDefect.severity: low · medium · high · critical
- InfraAssessment.status: draft · approved · rejected · superseded
- InfraRemedialWork.status: planned · in_progress · completed · cancelled
- InfraVerification.result: pass · fail; status: recorded · superseded
- InfraAsset.asset_type: berth · wharf_structure · fender · bollard · pavement · conveyor_support · utility · other
- InfraAsset.condition_grade / InfraInspection.condition_grade: good · fair · poor · critical · unknown
- InfraAsset.status: in_service · restricted · out_of_service · decommissioned
- InfraInspectionPlan.method: visual · instrumented · diving · structural · other; status: active · suspended · retired
- InfraInspection.status: draft · accepted · rejected
- InfraArea.area_type: berth_area · wharf · yard · stockpile · conveyor_corridor · road · utility · other
- InfraDependency.dependency_type: equipment_installed · handling_route · berth_structure · evidence · other; status: active · inactive
- InfraObligationTask.status: open · in_progress · done · cancelled
- InfraCaseLink.status: linked · closed
- InfraSafetyHold.hold_state: active · released
Workflow actions (Phase 2 — guards are documented, not enforced yet)
| Action | On | Moves | Guards in the pack |
|---|---|---|---|
| approve_assessment | InfraAssessment | draft → approved | assessment complete; approver authorised |
| activate_restriction | InfraRestriction | draft → active | approved assessment or emergency authority; effective time and review due recorded |
| complete_remedial_work | InfraRemedialWork | in_progress → completed | work evidence recorded |
| release_restriction | InfraRestriction | active → released | independent verification pass; all linked remedial work complete; no other restriction implicitly released |
Dashboard tiles (pack)
Active restrictions · overdue inspections · open defects.
Events
| Direction | Event | Handler (scaffold — Phase 2) |
|---|---|---|
| Published | infrastructure.restriction_changed (when a restriction becomes active or released) |
— |
| Consumed | safety.restriction_changed |
Apply or release only the named scoped hold; never clear other holds (InfraSafetyHold) |
| Consumed | assurance.obligation_assigned |
Create or link a local obligation task (InfraObligationTask) |
| Consumed | assurance.case_closed |
Update the correlated case link only (InfraCaseLink) |
Run, seed, regenerate
python server/run.py prt_01_infra # http://localhost:5201
python -m codegen.cli all prt_01_infra # regenerate models, controllers and JSON after a schema change
python -m codegen.cli seed prt_01_infra --reset # reload the sample data
python scripts/build_diagram_viewer.py prt_01_infra # rebuild the interactive diagram
python -m codegen.cli integration prt_01_infra --network port_terminal_operations --check
The DSL and the integration files are generated by
docs/port_terminal/translate_stage1.pyfrom the pack — change the translator, not the generated files.